| 配方類型: |
METALS AND THEIR TREATMENT |
| 配方說明: |
Metal Cleaning Prior to Powder Coating |
| 配方組成: |
|
| 配制方法: |
Prior to powder coating the parts pass through a three stage spray washer and phosphatizing machine. Soil is removed in the first stage with a 1-min phosphoric acid spray at 150F, followed by an ambient temperature water rinse for 1/2 min, then a chromic acid rinse at 160F for 1/2 min. Moisture is removed in a 4-min. pass through a dry-off oven at 350F. Cooling time is 8 to 10 min. |
|